1. Kupu Whakataki me Nekeview
This manual provides essential information for the safe and efficient operation, installation, and maintenance of your WOLF ComfortLine CGB-2K-20 Gas Condensing Combi Boiler. Please read these instructions carefully before installation or use and keep them for future reference. This appliance is designed to provide both heating and domestic hot water for residential applications.
2. Nga korero haumaru
Nga Tohutohu Haumaru Nui: Adherence to these safety guidelines is crucial for preventing accidents and ensuring the longevity of your appliance.
- Installation, maintenance, and repair must only be carried out by a qualified and authorized professional in accordance with all local and national regulations.
- Do not attempt to modify the appliance or its components. Unauthorized modifications can lead to dangerous situations and void the warranty.
- Ensure adequate ventilation in the installation area to prevent the accumulation of harmful gases.
- In case of gas odor, immediately shut off the gas supply at the main valve, open windows and doors to ventilate the area, and contact a qualified technician or your gas provider. Do not operate electrical switches or use open flames.
- Keep flammable materials, liquids, and aerosols away from the appliance.
- Regular inspections and maintenance by a professional are crucial for safe and efficient operation and to identify potential issues before they become serious.
- Do not block any ventilation openings on or near the appliance.
3. Whakaahuatanga Hua me nga ahuatanga
The WOLF ComfortLine CGB-2K-20 is a highly efficient and modern gas condensing combi boiler designed for both central heating and instantaneous domestic hot water preparation. Its advanced condensing technology optimally utilizes gas and recovers residual energy from exhaust gases, leading to significant environmental protection and energy savings. This wall-mounted unit is suitable for single and multi-family homes, making it ideal for both new constructions and renovation projects.

Whakaahua 1: Roto view of the WOLF ComfortLine CGB-2K-20 boiler. This image illustrates the compact arrangement of the burner, heat exchanger, and other essential components within the unit.
Āhuatanga matua:
- Efficient Condensing Technology: Maximizes energy utilization and heat recovery from exhaust gases, resulting in lower fuel consumption and reduced emissions.
- Taumahinga Takirua: Provides both central heating for your home and instant domestic hot water on demand, eliminating the need for a separate hot water tank in many cases.
- Hoahoa Kiato, Tiaki Mokowā: The wall-mounted unit is designed to fit into smaller spaces, making it suitable for various installation environments.
- Hototahi Mana Ataata: Can be conveniently operated and monitored via the WOLF BM-2 operating module or directly through the WOLF Smart Set app, offering intuitive control over your heating system.
- Precise Flow Control: Ensures a constant hot water tap temperature, providing comfort and reliability.
- Whakawhiti Wea Roa: Features an integrated stainless steel heat exchanger that complies with European directives DIN EN 483 and DIN EN 12828, ensuring long-term performance and corrosion resistance.
4. Tatūnga me te Tāuta
The WOLF ComfortLine CGB-2K-20 boiler must be installed by a certified heating engineer in strict accordance with all local and national building codes, gas safety regulations, and the provided specialist installation manual. Improper installation can lead to serious hazards and will void the product warranty.

Whakaahua 2: Example of the WOLF ComfortLine CGB-2K-20 boiler installed in a residential setting. The compact design allows for discreet wall mounting.

Whakaahua 3: Tetahi atu view of the WOLF ComfortLine CGB-2K-20 boiler installed, demonstrating its minimal footprint and aesthetic integration.
Ngā Hipanga Tāutanga Whānui (mō ngā tohunga whai tohu):
- Kōwhiringa Pae: Choose an appropriate location for wall mounting, ensuring sufficient clearance for maintenance and ventilation.
- Whakapiki: Securely attach the provided mounting bracket to the wall and hang the boiler.
- Hononga hau: Connect the gas supply line to the boiler's gas inlet. A gas ball valve with fire protection device must be installed upstream.
- Hononga wai: Connect the heating flow and return pipes, as well as the cold and hot domestic water lines, using the provided connection angles. Install maintenance valves for isolation.
- Flue Gas System: Install the appropriate air/exhaust accessories according to the specific planning instructions and local regulations for flue gas discharge.
- Whakarerenga Whakarere: Connect the condensate drain funnel with a hose holder to a suitable drainage system.
- Hononga Hiko: Connect the boiler to the electrical supply as per wiring diagrams in the specialist manual.
- Control System Integration: Install and connect the chosen control system, such as the BM-2 operating module or AM display module, for room or weather-compensated control.
- Pūrere Haumaru: Ensure all required safety devices, including the heating side safety valve and safety group, are correctly installed and commissioned.
- Whakataunga: Perform a thorough commissioning process, including leak tests, functional checks, and flue gas analysis, as detailed in the commissioning checklist.
5. Nga Tohutohu Whakahaere
Your WOLF ComfortLine CGB-2K-20 boiler is designed for user-friendly operation. It can be controlled via the WOLF BM-2 operating module or the Smart Set app for convenient and intuitive management of your heating and hot water system.
Mahi Taketake:
- Hiko Whakaka/Weto: Use the main power switch on the unit or the control module to turn the boiler on or off. Ensure the boiler is always powered on during cold periods to prevent freezing.
- Aratau Whakawera: Set your desired room temperature or heating schedule using the control module. The boiler will automatically adjust its output to maintain comfort efficiently.
- Hot Water Mode: The combi boiler provides hot water on demand. Ensure the hot water temperature setting on the control module is appropriate for your needs. The precise flow control ensures a consistent temperature.
- Aroturuki Pūnaha: The control module or app provides real-time information on system status, temperatures, and any potential error messages. Familiarize yourself with these indicators.
- Whakatika Tautuhinga: Consult the separate user manual for the BM-2 operating module or the Smart Set app for detailed instructions on adjusting heating programs, hot water temperatures, and other advanced settings.
6. Tiaki
Regular maintenance is essential to ensure the long-term efficiency, safety, and reliability of your WOLF ComfortLine CGB-2K-20 boiler. Neglecting maintenance can lead to reduced performance, increased energy consumption, and potential safety hazards.
Apiti Tiaki Manakohia:
- Ratonga Ngaio ā-Tau: Have the boiler inspected and serviced annually by a qualified heating engineer. This service typically includes:
- Cleaning of the burner and heat exchanger.
- Te tirotiro me te whakatikatika i te pehanga hau.
- Inspecting all safety devices.
- Checking the flue gas system for blockages or leaks.
- Verifying the proper operation of controls and sensors.
- Checking system water pressure and topping up if necessary.
- User Checks (Monthly/Quarterly):
- Whakarerenga Whakarere: Periodically check and clean the condensate drain system to prevent blockages. Ensure the condensate trap is filled with water.
- Pēhanga wai: Monitor the system water pressure on the boiler's display or control module. If it falls below the recommended range (typically 1.0-1.5 bar when cold), top up the system as per the specialist manual or contact your installer.
- Tirotiro Ataata: Regularly check the appliance for any visible signs of damage, leaks, or unusual noises. Report any concerns to a qualified technician immediately.
A dedicated maintenance instruction manual is included with the product for detailed procedures and specific recommendations.
7. Te Raru
If your WOLF ComfortLine CGB-2K-20 boiler is not functioning correctly, consult the following basic troubleshooting steps. For complex issues or if the problem persists, always contact a qualified service technician. Kaua e ngana ki te whakatika i a koe ano.
Nga take me nga otinga noa:
- No Heating or Hot Water:
- Taki Hiko: Ensure the boiler is powered on at the main switch and that there are no tripped circuit breakers.
- Tirohia te Pūnga Hau: Verify that the main gas valve to the property and the isolation valve to the boiler are open.
- Thermostat/Control Settings: Confirm that the thermostat or control module settings are correctly set for heating and hot water demand. Ensure the desired temperature is higher than the current room temperature.
- Pēhanga wai Pūnaha: Check the system water pressure on the boiler's display or control module. If it is too low, the boiler may not operate. Refer to the maintenance section for topping up instructions.
- Parenga haupapa: During cold weather, ensure the boiler's frost protection is active or the system is adequately protected.
- Ngā Waehere Hapa e Whakaaturia ana:
- If an error code is displayed on the control module, make a note of the code. Refer to the specialist manual or contact a qualified technician, providing them with the error code for diagnosis.
- Haruru rerekee:
- If you hear persistent or loud unusual noises (e.g., banging, gurgling, whistling), this could indicate a problem such as air in the system or a component malfunction. Contact a service technician immediately.
- Leakage:
- If you notice any water leaks from the boiler or pipework, immediately turn off the water supply to the boiler and contact a qualified technician.
For your safety, never attempt to open the boiler casing or perform internal repairs. Always rely on certified professionals.
8. Whakatakotoranga
Detailed technical specifications for the WOLF ComfortLine CGB-2K-20 Gas Condensing Combi Boiler:
| Huanga | Uara |
|---|---|
| Kaihanga | Wolf |
| Tauira | ComfortLine CGB-2K-20 |
| Tau Tuhinga | 8615011 |
| Rahi Hua (L x W x H) | 37.8 x 44 x 79 cm |
| Taumaha | 33 kg (āwhiwhi. 72.75 lbs) |
| Tae | Mā |
| Putanga Mana Ingoa | 20 kW |
| ASIN | B07S1TDRDF |
| Te Ra Wātea Tuatahi | 2 Whiringa-ā-rangi 2021 |
9. Nga Waahanga kei roto
The following components are typically included with your WOLF ComfortLine CGB-2K-20 boiler upon delivery:
- 1 × Gas burner (connectable, covered)
- 1 × Mounting bracket for wall installation
- 1 × Instruction manual for specialists
- 1 × User manual (this document)
- 1 × Maintenance instructions
- 1 × Commissioning checklist
- 1 × Sticker "G31/G30" (for transition to liquid gas)
- 2 × Connection angles for cold/hot water
Tuhipoka: Certain essential accessories such as air/exhaust components, room or weather-compensated control modules (e.g., BM-2 or AM), condensate drain funnel with hose holder, maintenance valves for heating flow and return, gas ball valve with fire protection, safety valve for the heating side, and a safety group are typically required for a complete installation but may be sold separately or supplied by your installer.
10. Pūtāhui me te Tautoko
Mōhiohio Pūtāhui: For specific warranty terms and conditions, please refer to the warranty documentation provided by your installer or included with your product. Warranty coverage typically requires professional installation and annual maintenance by a qualified technician.
Tautoko Kiritaki: If you require technical assistance, spare parts, or professional service for your WOLF ComfortLine CGB-2K-20 boiler, please contact your authorized WOLF dealer or a qualified heating technician. When contacting support, ensure you have your product model (CGB-2K-20) and article number (8615011) available to facilitate quicker assistance.
You can find contact information for authorized WOLF partners on the official WOLF webpae.





