BFT P125002

Pukapuka Tohutohu mō te Kete Tārua Pūhiko BFT SB-BAT P125002 24V DC

For BFT Gate Opener Systems

1. Kupu Whakataki

This manual provides essential instructions for the installation, operation, and maintenance of the BFT SB-BAT P125002 24V DC Battery Backup Kit. This kit is designed to ensure continuous operation of compatible BFT gate openers during temporary power outages. Please read this manual thoroughly before proceeding with installation or use.

2. Hua Neke Atuview

The BFT SB-BAT P125002 is a 24V DC battery backup system that integrates with specific BFT gate operators. It includes a smart charger board that manages battery charging when main power is available and automatically switches to battery power when the main supply is interrupted.

BFT SB-BAT P125002 Battery Backup Kit components in box

Whakaatu 1: Neke Atuview of the BFT SB-BAT P125002 Battery Backup Kit, showing the product box, two batteries, wiring, and mounting hardware.

2.1. Wae Kete

Individual components of the BFT SB-BAT P125002 Battery Backup Kit

Whakaatu 2: Taipitopito view of the BFT SB-BAT P125002 kit components, including batteries, wiring, mounting brackets, and the battery holder.

3. Hototahi

This battery backup system is compatible with the following BFT gate operator series:

Ensure your gate operator model is listed above for proper functionality.

4. Tatūnga me te Tāuta

Installation of the BFT SB-BAT P125002 kit is designed to be straightforward. However, it is recommended that installation be performed by a qualified technician to ensure safety and correct operation. Always disconnect main power to the gate operator before beginning installation.

4.1. Whakatupato Haumaru

4.2. Nga Waahi Whakataunga (Nga Aratohu Atoa)

  1. Mount the Battery Holder: Secure the battery holder/mounting base within the gate operator's control box or an appropriate enclosure using the provided mounting brackets and fasteners. Ensure it is stable and accessible.
  2. Kōkuhu Pūhiko: Place the two 12V 1.2Ah batteries into the battery holder.
  3. Tūhono Pūhiko: Connect the batteries in series to achieve 24V DC, following the wiring diagram provided with your specific gate operator or the kit's smart charger board. Ensure correct polarity.
  4. Connect Smart Charger Board: Integrate the smart charger board into the gate operator's control unit. Refer to your gate operator's manual for the specific connection points for the battery backup system.
  5. Waea Haumaru: Route and secure all wiring to prevent pinching or damage.
  6. Whakaora i te Mana: Once all connections are verified and secure, restore main power to the gate operator. The smart charger board will begin charging the batteries.
  7. Pūnaha Whakamātautau: Perform a power outage simulation to verify the battery backup system activates correctly and powers the gate operator.

5. Nga Tohutohu Whakahaere

The BFT SB-BAT P125002 operates automatically once installed correctly.

5.1. Normal Operation (Power On)

When main power is supplied to the gate operator, the smart charger board within the SB-BAT kit continuously monitors the battery charge level. It will charge the batteries as needed to maintain them at full capacity.

5.2. Mana Outage Operation (Power Off)

Ina he mana outage, the smart charger board automatically detects the loss of main power and switches the gate operator to battery power. The gate operator will then function normally using the stored energy in the batteries. The duration of operation on battery power depends on the frequency of gate usage and the charge level of the batteries.

6. Tiaki

Regular maintenance ensures the longevity and reliability of your battery backup system.

6.1. Battery Recharging

I muri i te mana outage, once main power is restored, the smart charger board will automatically begin recharging the batteries. A full recharge typically takes 12 ki te 14 haora. It is important to allow sufficient time for batteries to fully recharge after use.

6.2. Fuse Check

Kei roto i te punaha he 20He whakakorikori for protection. If the battery backup system fails to operate or charge, inspect the fuse for continuity. Replace with a fuse of the exact same rating if necessary. Always disconnect power before checking or replacing fuses.

6.3. Te Ora Pūhiko me te Whakakapinga

Batteries have a finite lifespan. Periodically test the system by simulating a power outage to ensure batteries hold a charge and can power the gate operator. If performance degrades significantly, consider replacing the batteries. Use only recommended replacement batteries (2x 12V 1.2Ah sealed lead-acid).

7. Te Raru

If your BFT SB-BAT P125002 battery backup system is not functioning as expected, consider the following:

For persistent issues, contact BFT technical support or a qualified service technician.

8. Whakatakotoranga

ĀhuahiraWhakatakotoranga
Tau tauiraP125002
Momo PūhikoWaikawa-a-Hiri
Pūhiko Raukaha2x (12V 1.2Ah)
Putanga Voltage24V DC (nominal)
Akene Voltage27.2V
Utu o naianei130mA
Te Waa Whakahou Pūhiko12-14 haora
Exhausted Battery Protection Threshold20.4V
Whakatauranga Whakakapi20A
Te Waahi MahiData detected with external temperature of: 25°C (77°F)

9. Pūtāhui me te Tautoko

For warranty information, please refer to the documentation provided with your original purchase or contact BFT customer support directly. For technical assistance, installation queries, or troubleshooting beyond the scope of this manual, please contact your authorized BFT dealer or BFT technical support.

BFT Contact Information: Please visit the official BFT webpae mo nga taipitopito whakapā me nga rauemi tautoko.

Tuhinga e pa ana - P125002

Preview BFT DEIMOS BT UL/CSA Electromechanical Gate Automation System
Discover the BFT DEIMOS BT UL/CSA, an electromechanical automation system for rack sliding gates. Featuring smart technology, 24V safe operation, and simplified installation, this system enhances gate security and convenience. Explore its technical specifications and available accessories for residential and commercial applications.
Preview BFT Mitto 2M/4M Tohutohu Whakawaehere Mamao: He Aratohu Matawhānui
Akohia me pehea te whakarite i to mana mamao BFT Mitto 2M me 4M mo nga karati me nga whakatuwhera kuaha. Ko tenei aratohu e hipoki ana i te tohu tohu mo nga kaiwhiwhi me nga mata mamati me te kore, tae atu ki nga whakatupato haumaru nui.
Preview Pukapuka Tāutanga Aunoa mō te Keti Piko BFT VIRGO
He aratohu tāutanga me te kaiwhakamahi whānui mō te pūnaha aunoatanga o te keti piu BFT VIRGO, e kapi ana i te haumaru, ngā whakaritenga hangarau, ngā tikanga tāutanga, te hōtaka me te tiaki.
Preview Manuale o Installazione and Uso BFT GIOTTO 30-60 S BT / GIOTTO 30-60 BT
Ko te aratohu kua oti mo te whakauru me te whakamahi i te aukati aunoa BFT GIOTTO 30-60 S BT me GIOTTO 30-60 BT. Whakaurua te hangarau motuhake, te whirihora me te whakahaere.
Preview Ngā Tohutohu Whakawaehere Mamao BFT MITTO 2B | Ngā Mamao Tawhito
He aratohu taahiraa-i-te-taahiraa mō te whakakōwae i ngā mana mamao BFT MITTO 2B mō ngā kaiwhakatuwhera kēti, e kapi ana i ngā tikanga mana mamao me te mata LCD o nāianei. Kei roto ko ngā tohutohu rapurongoā.
Preview Aratohu Tāutanga Pūnaha Whakahaere Reo Irirangi BFT CLONIX1-2 me MITTO 2-4 433MHz
He aratohu tāutanga whānui mō te kaiwhiwhi BFT CLONIX1-2 me ngā tuku mana reo irirangi MITTO 2-4 433MHz, e kapi ana i te hōtaka, te tāruarua, te haumaru, me ngā whakaritenga hangarau mō te aunoatanga o te keti me te tatau.